Steelheft Open SteelheftOpen
EN RU

Every set, worked out.

Enter a heavy set from the last few weeks: Steelheft works out today’s weight from it, down to the plates on the bar.

Your best set, last 6 weeks

115kg

Today: 5 reps, 2 in reserve

102.5kg

25 + 15 + 1.25per side, 20 kg bar

Free. The first 1,000 accounts get Pro for life.

The iPhone app is next. Until then Steelheft runs in your browser and installs to the home screen.

Live app · tap anything

Steelheft home screen: bench press, 102.5 kg today, 25 + 15 + 1.25 kg per side

Trackers write it down. Steelheft works it out.

Today’s weight from the top, step by step. Change your set above and every line follows.

Try it on your own numbers: one-rep max, RPE chart, plates per side.

  1. Your best setUp to 8 reps, last 6 weeks115 × 3
  2. Estimated maxEpley: 115 × (1 + 3/30)126.5kg
  3. Share for 5 reps, 2 in reserveRPE 8: 1 ÷ (1 + 7/30)81%
  4. Today’s weight126.5 × 0.81 = 102.6, rounded to the plates you load 102.5kg
25 + 15 + 1.25 per side, 20 kg bar

Four weeks that drive progress.

Load climbs for three weeks, then week four is light: fatigue clears, the gains stay.

Week 3 +30%

100sets a week

Build: volume climbs 15% and 30% while the weight holds.

Four-day plan, intermediate, gym.

The plan answers to recovery.

When two of four fatigue signs are down, today turns into a deload: half the sets, 10% off the weight.

Today · Upper Deload
29 sets todayas planned

102.5kg

Bench press, as planned

70min

Session time
  • Bench press5 × 5–7
  • Lat pulldown or pull-ups5 × 8–10
  • Standing barbell press4 × 6–8
  • Smith machine row5 × 8–10
  • Dumbbell lateral raises5 × 15–20
  • Overhead triceps extension5 × 10–12

Mark two signs of fatigue and this day is cut in half.

Everything around the bar.

No AI.

Every call comes from a rule written in plain words, and the app shows it right next to the decision.

Working weight
Your best set of up to 8 reps in 42 days by Epley, plus reserve from RPE.
Plates
Weights round to what you can load: 2.5 kg or 5 lb steps.
Deload
Two of four fatigue signs: half the sets and 10% off the weight.
Mesocycle
Build ×1, ×1.15, ×1.3, ×0.6. Cut and maintain have their own waves.
Calories
Every 14 days against your goal’s pace. Only carbs move, 150 kcal at a time.
Body
Body fat as a range as wide as the tape’s error. A missed measurement stays blank.

Logging stays free. Pro opens the math.

Right now only the free plan is available. Pro opens with purchases in the app.

Free

$0forever

  • Training plan
  • Set log
  • Weight and measurements
  • The last 4 weeks of history

Pro Soon

$9.99a month

or $59.99 a year, first month free

  • Lifts, tonnage and relative intensity
  • Mesocycle wave and deload from fatigue
  • Working weights from % of your max
  • Your whole history and export

Founder spot: Pro for life, free, for the first 1,000 accounts. Take yours

Questions

When can I get it?

On Android, from Google Play. Anywhere else, as a web app at app.steelheft.com that installs to the home screen. The iPhone app is coming to the App Store: take a spot in early access and we’ll write the day it’s live.

Kilograms or pounds?

Either, set in your profile. The plates follow: a 20 kg bar with 25 to 1.25 kg plates, or a 45 lb bar with 45 to 2.5 lb plates.

What stays free?

The plan, the set log, weight and measurements, and the last four weeks of history. Logging a workout is never locked.

Do I need my own program?

No. Steelheft builds a plan from a few answers: days a week, experience, equipment and goal. A coach’s program can be loaded from Excel.

Which languages does it speak?

English, Russian and Chinese.

What happens to my data?

It lives in your account and syncs between your devices. You can delete the account, with everything in it, right from the app.

How do I get into the beta?

Join early access and tick “I want to join the beta”. On iPhone the beta runs through TestFlight, on Android through Google Play testing.

The first 1,000 get Pro for life. Free.

Open Steelheft and take your spot in the Pro window. Pro opens right away and stays on your account for life. No card, nothing to pay later.

Or reserve a spot by email
Phone

Your spot

of 1,000

Open Steelheft